Free BCA Projects
PERT chart of Free BCA project Event management system
The success of any large-scale project is very much dependent upon the quality of planning, scheduling and controlling of the various phase of the project. Unless some type of planning and coordinating tool is used, Free BCA Project number of phases does not to be very large before management starts losing controls. One such OR tool used on large-scale project to aid management in expanding and controlling the utilization of personal, material, facilities, and time is Free BCA Project program evaluation and review technique (PERT). This technique is used to pinpoint critical areas in a project necessary adjustments can be made in order to meet the schedule completion date the project.
Free BCA PROJECT # 1 ONLINE EXAMINATION SYSTEM
FRONT END - ASP.NET, C#
BACK END - SQL SEVER 2007
Click here to Downlaod Project SYNOPSIS OF ONLINE EXAMINATION SYSTEM
Free BCA PROJECT # 2- Hospital Information System
FRONT END - VB6.0
BACK END - SQL SEVER 2000
Click here to download SYNOPSIS of Project Sanatorium (Hospital Information System)
Free downlaod Final report of project Hospital Information System
FRONTEND - C # AND .NET FRAMEWORK
BACKEND - SQL SERVER 2008
Download Project SYNOPSIS OF ONLINE AUCTION SYSTEM
Free download FINAL REPORT OF PROJECT ONLINE AUCTION SYSTEM
Free Download Project Synopsis of MEDICAL & SURGICAL SUPPLIERS
FreeDownload Project Final report of MEDICAL & SURGICAL SUPPLIERS
Free BCA Project on Event management system From Page 1 to 7
Project scheduling by PERT consist of four main steps:-
Planning
Scheduling
Allocating of resources
Controlling
The Pert chart of the overall
implementation is shown in following figures:-
NODE
|
DESCRIPTION
|
UTILIZE THE NO. OF DAYS
|
1
|
Selection of organization
|
10 Days
|
2
|
Selection of problem
|
7 Days
|
3
|
Collecting the information
|
25 Days
|
4
|
Analysis of information
|
10 Days
|
5
|
Designing of the Application
|
40 Days
|
6
|
Coding for Free BCA Project Application
|
45 Days
|
7
|
Review the specification
|
7 Days
|
8
|
Validation / Verification
|
7 Days
|
9
|
Testing
|
18 Days
|
10
|
Dummy activity
|
5 Days
|
THE PERT Chart is
representing the interdependencies among tasks. The PERT provides quantitative
tools that allow Free BCA Project software planner to determine the critical
path. The PERT Chart use is justified in large projects.
THE PERT Chart Diagram
Node 1 - Organization
Selection
Node 2 - Proj /
Prob Selection
Node 3 -
Information collect
Node 4 – Analysis
of Information
Node 5 - Design of
the application
Node 6 - Review
the Specification
Node 7 - Coding
Node 8 -
Verification/Validation
Node 9 – Testing
Node 10 – Dummy
Activity
6. Free BCA Project Solution Scope:-
·
The
entire application needs to be a web-based application running on the Internet
with security-based access for NC Techsoft Coordinators and staff.
·
Significant
time was currently being spent in Free BCA Project very first stages itself of
client interactions – namely Estimate preparation. Since a lot of the work that
NC Techsoft carries out is similar for a particular type of event, there was
the scope to create Event Templates based on the type of event. For example, if
an Educational Seminar Event were to be conducted for an IT Training Institute,
then the list of things to be done under such an event would be more or less
the same all the time. The dates may change and the specific service provider
may change. The content of what needs to be delivered will change. But
essentially, from an estimation perspective, the checklist remains the same.
Therefore, it should be possible to create Event Templates for different kinds
of events which will include all known important services under with a default
vendor (which can be changed from time to time) for each service. Thus,
selecting an Event Template and modifying its dates and service selections can
arrive at Free BCA Project Estimation at almost immediately. These templates
are likely to be very detailed based on the extensive experience of handling
such events in the past.
·
The
Event Worksheet is a full statement of Costs and Revenues for the event. One
source of revenue for the event is through Sponsors. Such sponsor funds may
come in the form of cash or sometimes through a specific deliverable. For
example, a Garment company would sponsor all hoardings for an event. The amount
set aside for that would now be considered as a revenue source and also as an
expense under Advertising hoardings. Ticket sales , for example, would figure
as a Revenue source. While estimating an Event, all sources of Revenues need to
be identified and recorded indicating either cash inflows or
service-sponsorship. The Event Worksheet is approved by Free BCA Project client
and signed when the contract is signed after making necessary changes.
·
It
should be possible to generate an Estimate from an event template for a
specified Client. The Estimate, when approved, would become the contract.
·
The
system should enable generation of Purchase Order based on the inclusions in
the Contract for specific Service Providers. Each Purchase order would have
multiple service descriptions, dates for delivery, units, rates and total
amounts with provisions for taxes and other charges. The Purchase Order would
also have a section to include terms of purchase. Each term specifies a
condition under which Free BCA Project service should be delivered and there
can be multiple terms in a Purchase Order. There should be a facility to store
all commonly used terms and conditions so that they can be quickly entered in
the PO .
·
Whenever
a Service is delivered, there should be a Service Delivery transaction that
should be entered with the authorization of the Coordinator who would check for
the quality of the service delivered. Service Acceptance slips are generated
and signed for by the Coordinator to indicate that the delivery was according
to the requirements. Payments are released only after acceptance and according
to Free BCA Project payment terms agreed upon with the Service Provider.
·
The
Solution Provider is expected to make recommendations in designing processes
within NC Techsoft that can capture the necessary kinds of data so that
critical monitoring information would be made available.
7.Analysis(Data Models like 0, 1 and 2 level
DFDs, Complete ER Diagrams with cardinality, Class Diagrams etc. as per the Free
BCA project requirement):-
Data modeling ( Free BCA Project ) :
Data modeling is a method used to
define and analyze data requirements needed to support the business processes
of an organization. The data requirements are recorded as a conceptual data
model with associated data definitions. Actual implementation of the conceptual
model is called a logical data model. To implement one conceptual data model
may require multiple logical data models. Data modeling defines the
relationships between data elements and structures.[2]
Data modeling techniques are used to model data in a standard, consistent,
predictable manner in order to manage it as a resource. Free BCA Project use of
this standard is strongly recommended for all projects requiring a standard
means of defining and analyzing the data resources within an organization.
Functional Model
The functional model
shows how output values in an computation are derived from input values,
without regard for the order in which the values are computed. The functional
model consists of multiple data flow diagrams which show the flow from external
inputs, through operations and internal data stores, to external outputs. The
functional model also includes constraints among values within an object model.
Data
Dictionary
A
data dictionary is a "centralized repository of information about
data such as meaning, relationships to other data, origin, usage, and
format." Free BCA Project term may have one of several closely related
meanings pertaining to databases and database management systems (DBMS):
- a document
describing a database or collection of databases
- an integral
component of a DBMS that is required to determine its structure
- a piece of
middleware that extends or supplants the native data dictionary of a DBMS
DFD (Data
flow diagram) of Free BCA Project event management system
A DFD is a graphical representation that depicts
information flow and the transforms that
are applied as data move from input to output. The DFD may be used to represent a system or
software at any level of abstraction DFD’s may be partitioned into levels that
represent increasing information flow and functional details. The DFD provides
a mechanism for functional modeling as well as information flow modeling.
A level “O” DFD, also called a fundamental system model
or a context model , represents the entire software element as single bubble with input and
output data indicated by incoming and outgoing arrows respectively.
A level
“1” DFD contain five or six bubbles with interconnecting arrows. Each of the
processes represented at level 1 is a sub function of the overall system.
Similarly
DFD level 1 can be refined into next level 2 .The information flow continuity
has been maintained between each levels.
DFD of Free BCA Project event management system