ABSTRACT
Our project Medical Inventory System mainly focus on the different medical related item sales/return system, which is highly user friendly easy to use, where in user can easy sales/return of item.
We have developed this Medical Inventory System as our semester project with a view to get familiar with the technology as well as with windows utility.
Our system mainly deals with different type of Medical item, customer, dealer very easily.
Since we had time constraints we were not able to make out module into live and living portal but would try for the same together with the interference.
Table
of Contents
SR.NO
|
Topic
|
Page no
|
1
|
Introduction
|
6
|
2
|
System Requirement Specification
|
9
|
3
|
Problem Identification
|
11
|
4
|
System Analysis
|
13
|
5
|
Priliminary
Investigation
|
16
|
6
|
Feasibility
Study
|
18
|
7
|
Problem
Analysis
|
20
|
8
|
System Development
Strategies
|
22
|
9
|
System Engg
Paradigm Applied
|
24
|
10
|
Information
gathering
|
28
|
11
|
System Flow
Diagram
|
30
|
12
|
Data Flow
Diagram
|
33
|
13
|
Data
Dictionary
|
39
|
14
|
E-R Diagram
|
45
|
15
|
Input Design
|
48
|
16
|
Output Design
|
61
|
17
|
Testing And
Implementation plan
|
69
|
18
|
Further
Enhancement Of The System
|
70
|
19
|
Bibliography
|
71
|
SYSTEM REQUIREMENT SPECIFICATION
Software Requirement
Development Side
Microsoft xp service pack 2 or upwards
Sql Server 2008
MS Office 2007
MS Visual Studio 2008
Crystal report 9.0 on later
Client Side
Microsoft xp service pack 2 or upwards
Sql Server 2008
Microsoft .Net Framework 3.5
Hardware Requirement
Development Side
CPU : Pentium-IV processor or any processor.
HARD DISK : 40 GB or above.
RAM : 256 MB or above.
Client Side
Ø CPU : Pentium-IV
processor or any processor.
Ø HARDDISK : 40 GB or above.
Ø RAM :
256 MB or above.
Ø DEVICE : printer
PROBLEM IDENTIFICATION
Existing System
The existing Medical Store System is manual system.The main drawback of the existing system is time consumption. There are number of records and hence a larger number of registers have to be kept to the store.
This document required more storing space, more manpower and job become tedious.
In Existing system following points are observed:
chances of errors and data processing time
Timely Due to manual process, required more time to complete user requirement
It will increase updating is complicated.
Security of data were not maintain
Need For The New System
The existing of Medical Store System is manually which require more paper work so it needs to computerized the system to get following benefits.Computer enhances easy and simple means of Storing information. The space occupied for storing of information is reduced.
Computers helps in fast retrieval of information .we can search information in a short of time.
Maintenance of data is very easy and workload is reduced.
It’s a paperless system.
We can generated report on demand.
It will give faster modification.
SYSTEM ANALYSIS - MEDICAL STORE INVENTORY AND BILLING MANAGEMENT SYSTEM
Requirement analysis is a software engineering task that bridges the gap between system engineering and software design. It provides the software designer with a representation of information and function that can be translated to data.
Before developing any computerized system, it is imperative to examine initially. The problem in the exiting system and also ascertain the basic needs that should be fulfilled by the proposed system the primary aspect of developing a full 1 fledged automated system would be to learn the current procedure and the information flow to locate the problem in the exiting system to identify what resources are used to discuss with user and their authority as to what improvement must in the exiting system.
Definition : -
Ø “Analysis of system is
process of gathering fact, solution of problem and to decide overall
constitution of the desired system. In system analysis we have to analyze all
the processes, related features, required function, available sources and the
time which should be specified for the analysis stage
Ø The most important phase
of developing any system is system analysis. Because of the analysis phase
decides that type of requirements, materials, strangles and techniques, models
are required.
Ø All these things are
depend upon our system that what type of our output of our system to function.
We desire from the system is responsible for defining the above factors. So the
overall structure of system that we want to implement will be decided in
analysis part of a system development by analyst.
Preliminary Investigation
Interviewing
The information is collected from system leader by interviewing to them a took suggesting from end user as per their requirement.
The information is collected from system leader by interviewing to them a took suggesting from end user as per their requirement.
Ø
Visiting
For Clarification, Visited To Hari-Om
Medical Store.
Ø
Questionnaires
By asking possible question to the system leader at the
time of interview some questionnaires to collect the required information.
Feasibility Study - MEDICAL STORE INVENTORY AND BILLING MANAGEMENT SYSTEM
Technical feasibility
Customer the work for the system can be done with the present equipment and three is no need of other technologies so this application is technically feasible.
Economic feasibility
All software packages are available or already exist in the company and institute so this system is economically feasible.
Operation feasibility
Ø System will be use
immediate because all staff is aware of how to operate so there is no need to
train them, so it is operationally feasible for the company and institute.
Ø At the end of investigation
it is found that this system is feasibly in all points of view.
Schedual feasibility
Ø It
is a measure of how reasonable the project timetable is
Implementation feasibility
Ø As far the Implementation is concerned, there would not be any
problem. All the user of it gets its service by only operate this system.
Problem Analysis
Ø We
are asked some question for good requirement those are as follow :
·
What is the
addition functionality you want in the system?
·
What are the
problems you face in the existing system?
·
What are you
expectation with the system?
·
How do you manage
to do this work manually?
·
Is there anything
else that wants to specify?
·
What the help of
analysis we tried out to reduce the communication gap between the user and us.
System Development Strategies
Ø There are three distinct approaches to the development of any good system as the point of view system analysis and design.
· System development life cycle method.
· Structure analysis development method.
· System prototype method.
Ø Here, starting with 1st system development life cycle method. Which has the following activities of any system?
· Preliminary investigation.
· Determination of system requirement.
· Design of system.
· Development of software.
· System testing.
· Implementation and evolution.
Software Engineering Paradigm Applied - MEDICAL STORE INVENTORY AND BILLING MANAGEMENT SYSTEM
·
The
waterfall model derivers its name due to the cascading effect from one phase to
the other as is illustrated in above fig.
·
In
this model each phase where define starting and ending point with identifiable
deliveries to the next phase.
·
Note
that this model is some time referred to as the linear sequential model or the
software life cycle model.
Ø The waterfall diagram is basically divided
into following 5 models.
- Requirement
- Design
- Implementation
- Verification
- Maintenance
Ø Requirement
- In the requirement phase the need to
create the application is specified what is the need of the system is
defined.
- What information to be feeder to
create the application will come under the requirement phase?
Ø Design
- After the requirement phase the next
phase is the design phase where the application is designed according the
forms and other modules created.
Ø Implementation
·
Implementation
is the process of having a system personnel phase check out and put new
equipment into use, train user, install new application and construct any file of data need to use it.
Ø Verification
- After
the whole application is being developed the main phase is verification
phase where the whole application tested and verifies to check the whole
application
Ø Maintenance
- After
the successful verification of the application the main phase is the
maintenance where the application needs to be maintained for its
successful operation in future.
Information Gathering
Ø Information from field
·
The
main information of this system is gathering from the
Hari-Om Store,Visnagar.
·
The
error of this system are seen the studied. Because of this error we need
necessary to develop.
·
This
type of system :
·
The
system mainly develop for organize for remove the paper work.
·
Other
detail are given to us from lecturer of our institute
Ø Information from books:
- The
detail of designing of coding of this system are viewed from the “The
complete reference of net programming book “, Master in VB.Net.
Data Dictionary
BRIEF DESCRIPTION OF PROCESS - MEDICAL STORE INVENTORY AND BILLING MANAGEMENT SYSTEM
Proposed system includes updating of master file and generation of Reports. Using VB.NET as Front-end and Sql Server 2008 as Back-end. Detail of purposed system is as below.
Item Details:
This stores the information about the Item in the Medical store. Store the information such as Item code, Item name, stock,etc.
Purchase Details:
This keeps information about the purchase Item from dealer . This stores information such as dealer name, Item name, price , quantity etc.
Billing Details:
This keeps details of all billing information. This keeps records customer who purchase our item including customer name, bill no, and total amount.
Process Algorithm
· Step-1:- Start
· Step-2:- Login Process
· Step-3:- Check user name and password.
· Step-4:- If No then Back the Login process. If Yes then enter the main process.
· Step-5:-Check for the Item availability. If No then add dealer/Item entry. If Yes then sale and receive payment.
· Step-6:- Check for the dealer/Item identify. If No any dealer then add dealer entry and go to step-5;
· Step-7:- If return Item Yes then check bill no and return Item or payment. If No then Exit.
· Step-8:- Generate bill.
· Step-9:- Exit.
After the preparation of our project we used it with the help of hypothetical data. As the requirement was satisfied with these data, we implemented the project on the original data.
The system though developed carefully, whenever it is taken in actual use may generate errors. So the main purpose of testing is to remove such type of runtime error and correct them. The scope of the system test includes both manual operation and computerized operations. We performed various system tests such as program test, string test, and system test.
Program test:
These are designed to test the logic of program. Under this testing, the individual forms were considered as a program and verification was done by entering hypothetical as well as original data.
These are used to test all programs which together constitute the system consisted of various forms. All forms are liked with each other perfectly and make our system a perfect one.
The review about post implementation from them is completely satisfactory. They are pleased with our services and our nature. We followed the rules of there school. We plan out our system according to their conve
Since modular and structure approach has been taken towards development of system, it can also expand other functions of the part of organization. It also very useful for the management. With the used of these system user can easily update the record, view the record and quickly generate the report.nience. They were totally satisfied and pleased with our system. They haven’t any problem regarding our project work.
· Step-1:- Start
· Step-2:- Login Process
· Step-3:- Check user name and password.
· Step-4:- If No then Back the Login process. If Yes then enter the main process.
· Step-5:-Check for the Item availability. If No then add dealer/Item entry. If Yes then sale and receive payment.
· Step-6:- Check for the dealer/Item identify. If No any dealer then add dealer entry and go to step-5;
· Step-7:- If return Item Yes then check bill no and return Item or payment. If No then Exit.
· Step-8:- Generate bill.
· Step-9:- Exit.
Testing - MEDICAL STORE INVENTORY AND BILLING MANAGEMENT SYSTEM
After the preparation of our project we used it with the help of hypothetical data. As the requirement was satisfied with these data, we implemented the project on the original data.
The system though developed carefully, whenever it is taken in actual use may generate errors. So the main purpose of testing is to remove such type of runtime error and correct them. The scope of the system test includes both manual operation and computerized operations. We performed various system tests such as program test, string test, and system test.
Program test:
These are designed to test the logic of program. Under this testing, the individual forms were considered as a program and verification was done by entering hypothetical as well as original data.
System test:
These are used to test all programs which together constitute the system consisted of various forms. All forms are liked with each other perfectly and make our system a perfect one.
Post Implementation Review
The review about post implementation from them is completely satisfactory. They are pleased with our services and our nature. We followed the rules of there school. We plan out our system according to their conve
Further Enhancement
In the system you can get the reports which includes bills,customers information. In the bills we can know the item information and also stock information.Since modular and structure approach has been taken towards development of system, it can also expand other functions of the part of organization. It also very useful for the management. With the used of these system user can easily update the record, view the record and quickly generate the report.nience. They were totally satisfied and pleased with our system. They haven’t any problem regarding our project work.
1 comment:
I would like to thank you for the efforts you have made in writing this chiropractic insurance billing article. I am hoping the same best work from you in the future as well..
Post a Comment